Pre-Installation
Less than 1 month
Location requirements:
•
Solid foundation
•
Vibration free
•
Dry
•
Temperature range -40°F to 158°F
(-40°C to 70°C)
•
Do not remove any plastic coverings
•
Do not charge the chiller with refrigerant
•
If additional refrigerant is on site, follow
manufacturer's storage requirements
•
Verify dry nitrogen pressure using gauge
located on the evaporator shell reads
3 to 5 psig (20.7 to 34.5 kPaG)
•
Notify the local Trane office if charge has
escaped
•
Do not operate purge unit
(a)
If the chiller will be stored for more than six months after production, contact your local Trane Service Agency for required extended storage actions to minimize impact to the
chiller and preserve the warranty.
16
1–6 months
Location requirements:
•
Solid foundation
•
Vibration free
•
Dry
•
Temperature range -40°F to 158°F
(-40°C to 70°C)
•
Do not remove any plastic coverings
•
Do not charge the chiller with refrigerant
•
If additional refrigerant is on site, follow
manufacturer's storage requirements
•
Verify dry nitrogen pressure using gauge
located on the evaporator shell reads
3 to 5 psig (20.7 to 34.5 kPaG)
•
Notify the local Trane office if charge has
escaped
•
Do not operate purge unit
•
Verify waterbox and tube bundles are
clean and dry
Greater than 6 months
Location requirements:
•
Solid foundation
•
Vibration free
•
Dry
•
Temperature range -40°F to 158°F
(-40°C to 70°C)
•
Do not remove any plastic coverings
•
Do not charge the chiller with refrigerant
•
If additional refrigerant is on site, follow
manufacturer's storage requirements
•
Verify dry nitrogen pressure using gauge located on
the evaporator shell reads 3 to 5 psig
(20.7 to 34.5 kPaG)
•
Notify the local Trane office if charge has escaped
•
Do not operate purge unit
•
Verify waterbox and tube bundles are clean and dry
•
Conduct an oil analysis and verify no oil breakdown
•
Repeat yearly
•
Replace oil if breakdown has occurred
•
If no oil analysis program has been followed, replace
oil prior to start-up
(a)
CDHH-SVX003C-EN