Appendix A: Forms and Check Sheets
The following forms and check sheets are included for
use with Trane start-up of CVHH CenTraVac™ chillers.
Forms and check sheets are used, as appropriate, for
installation completion verification before Trane start-
up is scheduled, and for reference during the Trane
start-up.
Where the form or check sheet also exists outside of
this publication as standalone literature, the literature
order number is also listed.
•
"Appendix B: CenTraVac™ Chiller Installation
Completion and Request for Trane Service," p. 119
(CTV-ADF001*-EN)
•
"Appendix C: CVHH CenTraVac™ Chiller Start-up
Tasks to be Performed by Trane," p. 121
118
•
"Appendix D: CVHH CenTraVac™ Chiller Annual
Inspection List," p. 123
•
"Appendix E: CVHH CenTraVac™ Chiller Operator
Log," p. 124
Unit Start-up/Commissioning
I I m m p p o o r r t t a a n n t t : : Start-up must be performed by Trane or an
agent of Trane specifically authorized to
perform start-up and warranty of Trane ®
products. Contractor shall provide Trane
(or an agent of Trane specifically
authorized to perform start-up) with notice
of the scheduled start-up at least two weeks
prior to the scheduled start-up.
CVHH-SVX001G-EN