Sign In
Upload
Manuals
Brands
Trane Manuals
Chiller
CVHH CenTraVac
Trane CVHH CenTraVac Manuals
Manuals and User Guides for Trane CVHH CenTraVac. We have
1
Trane CVHH CenTraVac manual available for free PDF download: Installation, Operation And Maintenance Manual
Trane CVHH CenTraVac Installation, Operation And Maintenance Manual (128 pages)
Water-Cooled Chillers With Tracer AdaptiView Control
Brand:
Trane
| Category:
Chiller
| Size: 6.39 MB
Table of Contents
Table of Contents
5
Unit Nameplate
8
Compressor Nameplate
9
Pressure Vessel Nameplates
9
Model Number Descriptions
11
Pre-Installation
12
ASHRAE Standard 15 Compliance
12
Unit Shipment
12
General Information
12
Installation Requirements and Contractor Responsibilities
13
Storage Requirements
14
Unit Components
16
Unit Clearances and Weights
17
Recommended Unit Clearances
17
General Weights
18
Weights (Lb)
18
Weights (Kg)
19
Installation: Mechanical
22
Operating Environment
22
Foundation Requirements
22
Rigging
22
Standard Chiller Lift
22
Special Lift Requirements
24
Unit Isolation
24
Isolation Pads
24
Spring Isolators
24
Leveling the Unit
26
Installation: Water Piping
28
Overview
28
Water Treatment
28
Pressure Gauges
28
Valves-Drains and Vents
28
Strainers
28
Required Flow-Sensing Devices
29
Water Flow Detection Controller and Sensor-Ifm Efector
29
Evaporator and Condenser Water
30
Piping
31
Water Piping Connections
32
Waterbox Locations
32
Grooved Pipe Coupling
33
Flange-Connection Adapters
33
Victaulic Gasket Installation
34
Screw-Tightening Sequence for Water
35
Piping Connections
35
Flanges with 8 or 12 Screws
35
Flanges with 16 or 20 Screws
35
Pressure Testing Waterside Piping
35
Vent Piping
36
Refrigerant Vent Line
36
General Requirements
36
Purge Discharge
36
Vent Line Materials
36
Vent Line Sizing
36
Vent Line Installation
37
Trane Ruptureguard
39
General Information
39
Connection to External Vent Line and Drip Leg
39
Vent Line Sizing Reference
40
Insulation
45
Unit Insulation Requirements
45
Insulation Thickness Requirements
45
Factory Applied Insulation
45
Installation: Controls
47
UC800 Specifications
47
Power Supply
47
Wiring and Port Descriptions
47
Communication Interfaces
48
Rotary Switches
48
LED Description and Operation
48
Installing the Tracer Adaptiview
51
Display
51
Adjusting the Tracer Adaptiview Display
51
Arm
52
Electrical Requirements
53
Installation Requirements
53
Wiring
55
Wiring
56
Current Transformer and Potential
57
Transformer Wire Sizing
57
Power Supply Wiring
58
Three-Phase Power
58
Circuit Breakers and Fused
59
Disconnects
59
CE for Control Power Transformer
59
CE for Starter or Drive
60
Control Power Transformer
61
Power Factor Correction Capacitors
61
(Optional)
61
Interconnecting Wiring
63
Starter to Motor Wiring
64
Mounted Starters Only)
64
Ground Wire Terminal Lugs
64
Terminal Clamps
65
Wire Terminal Lugs
65
Bus Bars
66
Starter to Control Panel Wiring
66
Medium Voltage Motor
68
Motor Terminal Box
68
Motor Supply Wiring
69
Motor Terminals
69
Ground Wire Terminal Lug
70
CE for Medium Voltage Starter
70
Wiring)
72
Switch Input
73
Chilled Water Pump
73
Chilled Water Proof of Flow
73
Condenser Water Pump
73
Condenser Water Proof of Flow
74
Sensor Circuits
74
CWR-Outdoor Option
76
Circuits
76
Optional Tracer Communication
76
Interface
76
Starter Module Configuration
76
Schematic Wiring Drawings
76
Operating Principles
77
General Requirements
77
Cooling Cycle
77
CVHH 3-Stage Compressor
77
CVHH 2-Stage Compressor
77
Oil and Refrigerant Pump
78
Compressor Lubrication
78
System
78
Motor Cooling System
81
Tracer Adaptiview Display
81
Ruptureguard
81
Operation
81
Earthwise Purge
81
General Information
81
Start-Up and Shut-Down
86
Sequence of Operation
86
Software Operation Overview
86
Diagram
86
Start-Up Sequence of Operation
87
Wye-Delta
87
Power up Diagram
90
Ice Machine Control
90
Free Cooling Cycle
92
Hot Water Control
93
Control Panel Devices and Unit-Mounted
93
Devices
93
Unit Control Panel
93
Support
93
Unit Start-Up and Shut-Down
94
Procedures
94
Daily Unit Start-Up
95
Seasonal Unit Start-Up
95
Daily Unit Shut-Down
96
Seasonal Unit Shut-Down
96
Earthwise Purge
96
Sequence of Operations
96
Air Removal
100
Pump-Out Operating Sequence
100
Carbon Tank and Regeneration
101
Subsystem
101
Recommended Maintenance
105
Record Keeping Forms
105
Normal Operation
106
Recommended Compressor Oil
107
Change
107
Purge System
107
Leak Checking Based on Purge Pump
107
Out Time
107
Leak Testing
108
Recommended System
109
Maintenance
109
Condenser
109
Evaporator
109
Waterbox and Tubesheet Protective
109
Coatings
109
Sacrificial Anodes
109
Ruptureguard Maintenance
110
Earthwise Purge
110
Maintenance
110
Installation
113
Discussion
113
Procedure
113
Reassembly
114
Torque Requirements and Waterbox
114
Weights
114
Screw-Tightening Sequence for Waterboxes
116
Evaporator Waterbox Covers
116
Condenser Waterbox Covers
116
Heat Recovery Condenser Waterbox
117
Covers
117
Appendix A: Forms and Check
118
Sheets
118
Unit Start-Up/Commissioning
118
Appendix B: Centravac™ Chiller
119
Trane Service
119
Appendix C: CVHH Centravac™ Chiller
121
Trane
121
Appendix D: CVHH Centravac™ Chiller
123
Annual Inspection List
123
Appendix E: CVHH Centravac™ Chiller
124
Operator Log
124
Advertisement
Advertisement
Related Products
Trane CVHE
Trane CVHF
Trane CVHG
Trane CVHE-SVX02M-EN
Trane CVHH
Trane CVHS
Trane CVGF
Trane CVGF1000
Trane CVGF500
Trane CVGF800
Trane Categories
Air Conditioner
Heat Pump
Chiller
Air Handlers
Furnace
More Trane Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL