PANEL INSTALLATION

The equipment must be installed indoors, with requirements refer chapter 4.3.
The installation of the panel must be carried out by qualified personnel. The electronic components that make up of the equipment, are vulnerable to physical
damage or electrostatic discharge. It is advisable to take anti-static precautions.
The equipment must be installed on a flat, dry surface at eye level and so that the housing is not deformed.
Use the fastening elements provided or similar ones, adapting them to the type of surface.
The cables must be inserted inside the box through suitable means (cable glands, not provided), avoiding rubbing with the metal edges of the box. Use the
pre-cut opening provided.
The panel must be mounted on a wall at a height of 1,70 m above floor level, such that the display is just above normal eye level.
Fig. 9: Mounting hight