Commissioning
after the links in the isolators have been removed and the system has been configured).
06
Use a meter to check that there are no connections between each cable screen and:
the +ve conductor of the cable
the -ve conductor of the cable.
Note: It is recommended that the cable screen is earthed at the panel.

CONNECTING THE OPAL/CLIP LOOP WIRING TO THE PANEL

It is recommended that the loop cable screen is earthed at the panel to the Earth bar.
OPAL loop wiring
When the OPAL loop wiring has been checked and found to be satisfactory, then connect the loop wiring to the
panel selected loop terminal block.
CLIP loop wiring
When the CLIP loop wiring has been checked, and found to be satisfactory, do the following:
Remove the temporary links on the isolator units, modules and MCPs and then connect the loop wiring to the
panel's selected loop terminal block.
Once a loop circuit is connected to the panel and on initial power up of the panel it will check and indicate where