Safety; Scope Of Delivery; Intended Use - Maico PP 45 RHK Installation Instructions Manual

Table of Contents

Advertisement

Available languages

Available languages

Preface
Preface
These instructions contain important information
about preparing for installation and installing
the unit components during the shell con-
struction phase.
Observe the attached safety instruction
sheet.
• For information re-
garding final installa-
tion
• For information on the
installation of ventila-
tion components,
commissioning and
the large variety of
setting possibilities for
the ventilation system
• For commissioning
software
• For information on
operation
Further instructions and videos
• Brief instructions for changing filters, setting
ventilation levels and operating modes
• Video PP 45 RC/PPB 30 Installation
• Video PP 45 Filter change / Video PPB 30 Filter
change
• Video - Connecting controls
• Video - PP 45 RC Teaching-in master and slave
• Video - Installation and teaching-in radio switch
DS 45 RC
• Video - RLS 45 K service menu , Video - RLS 45
O service menu, Video - PP 45 RC service menu

1 Safety

• Read these instructions and the enclosed
safety instructions carefully before installa-
tion.
• Follow the instructions.
• Pass these instructions on to the owner/operat-
ing company for safekeeping.
24
→ PP 45 installation in-
structions for final as-
sembly kit or PPB 30 in-
stallation instructions
for final assembly kit
→ PP45/PPB 30 install-
ation and commission-
ing instructions
→ PP 45 / PPB 30 op-
erating instructions

2 Scope of delivery

Scope of delivery depends on system config-
uration → Installation dimensions [} 36].
• Safety instruction sheet
• External cover PP 45 AK / PP 45 AW /
PP 45 AE / PP 45 AS / PP 45 AKR /
PP 45 AKB / PPB 30 AK / PPB 30 AW /
PPB 30 AE / PPB 30 AS → Installation in-
structions for external cover.
• Shell sleeve, short PP 45 RHK (0059.0081)
• Shell sleeve, long PP 45 RHL (0059.0082)
• Wall sleeve, plaster protective cover and
shims → Installation [} 28].
• Soffit element PP 45 LE (0093.0179)
• only for connection to PP 45 units
• Soffit element, rubber seal wall sleeve, com-
plete stainless steel external grille (with ex-
ternal grille, holder and wall seal)→Installa-
tion [} 28].
• Optional: Extension element PP 45 LEV
(0093.1483) → Installation [} 28].
• Compensating frame PPB 30 ARE
(0093.1501) / PPB 30 ARW (0093.1525)
• Compensating frame for mounting on thin
walls. The external covers can be mounted
on the compensating frame.
• PPB 30 ARE (stainless steel compensating
frame) with the fixing plate PPB 30 ARE BB
is used for installing the PPB 30 AE and
PP 45 AE.
• PPB 30 ARW (white compensating frame)
with the fixing plate PPB 30 ARW BB is
used for installing the PPB 30 AW and PP
45 AK / PP 45 AW . No fixing plate is re-
quired when installing the PPB 30 AK.
• Fixing plate PPB 30 ARE BB (0093.1526) /
PPB 30 ARW BB (0093.1527)
• Fixing plate for compensating frame PPB 30
ARE / PPB 30 ARW.

3 Intended use

PP 45/PPB 30 units with heat recovery are used
for air extraction/ventilation of apartments, offices
and similar rooms. They are suitable for new
buildings and renovation work. The units are de-
signed for 24h operation. The housing unit's vent-
ilation system should be configured in accordance
with DIN 1946-6.

Advertisement

Table of Contents
loading

Table of Contents