Preface; Safety; Scope Of Delivery; Intended Use - Maico DS 45 RC Installation Instructions Manual

Final installation kit
Table of Contents

Advertisement

Available languages

Available languages

1 Preface

1 Preface
These instructions contain important information
about final installation of the slide-in modules
and internal covers. Final installation takes
place once the plastering and paint work is com-
plete.
Note the enclosed safety instructions.
• For information on
shell installation
• For information on the
installation of ventila-
tion components,
commissioning and
the large variety of
setting possibilities for
the ventilation system
• For commissioning
software
• For information on
operation
• Accessory compon-
ents
Further instructions and videos
• Brief instructions for changing filters, setting
ventilation levels and operating modes
• Video - PP 45 Connecting the internal cover
• Video - PP 45/PPB 30 filter change
• Video - Connecting controls
• Video - Installing and teaching-in DS 45 RC ra-
dio switch
• Videos - RLS 45 K Service menu, RLS 45 O
Service menu, RLS 45 RC Service menu
• Video - PP 45 RC Teaching-in master and
slave
• Video - PP 45 RC, PPB 30 RC installation

2 Safety

• Read these instructions and the enclosed
safety instructions carefully before installa-
tion.
• Follow the instructions.
• Pass these instructions on to the owner/operat-
ing company for safekeeping.
32
→ PP 45/PPB 30 shell
installation instructions
→ PP 45/PPB 30 in-
stallation and commis-
sioning instructions
→ PP 45/PPB 30 oper-
ating instructions
→ enclosed installation
instructions

3 Scope of delivery

Scope of delivery depends on system con-
figuration.
PP 45 O ventilation unit
• Slide-in module, complete with fan unit and
ceramic heat exchanger
• One G2 and one G3 air filter
• Complete internal cover with manually ad-
justable shutter
• Motor connection plug with separate sheet
metal
• These installation instructions for final installa-
tion kit
PP 45 K ventilation unit
• Slide-in module, complete with fan unit and
ceramic heat exchanger
• One G2 and one G3 air filter
• Complete internal cover with manually ad-
justable shutter
• These installation instructions for final installa-
tion kit
PP 45 RC ventilation unit
• Slide-in module, complete with fan unit and
ceramic heat exchanger
• One G2 and one G3 air filter
• Complete internal cover with manually ad-
justable shutter
• These installation instructions for final installa-
tion kit

4 Intended use

PP 45 ventilation units with heat recovery are
used for air extraction/ventilation of apartments,
offices or similar rooms. They are suitable for new
buildings and renovation work. The units are de-
signed for 24h operation. The housing unit's vent-
ilation system should be configured in accordance
with DIN 1946-6.
PP 45 are ventilation units, which are generally
only suitable for use in supply air rooms. To
achieve efficient ventilation of these units, we
would recommend operating the PP 45 in pairs,
with alternating ventilation and air extraction.
The units are installed in exterior walls (wall thick-
ness 265-790 mm) The electrical connection is
made to a permanent electrical installation.

Advertisement

Chapters

Table of Contents
loading

Table of Contents