Page 2
Mounting and operating instructions Recess-mounted exhaust air system according to DIN 18017-3 ER-UP/G ER-UPD ER-UPB ER 60 ER 100 Centro-M Centro-E w w w . m a i c o - v e n t i l a t o r e n . c o m...
Page 3
Fan inserts (final assembly) Scope of delivery Depending on order, comprising: Fan insert ER 60 .. / ER 100 .. ● Shell kit: ER recessed-mounted housing article no. Internet or catalogue. ● Final assembly set: Fan insert ● Fan inserts with different control circuit ●...
1. General notes 1. General notes 4. Non-intended use Please read these instructions These fans must not be used in the following carefully. Follow the instructions. situations under any circumstances. Read Pass these instructions onto the all the safety instructions. owner.
4. Non intended use 5. Safety instructions NOTICE: Damage to the unit ● During the build phase, damage to unit caused by soiling of the fan and air WARNING channels. Fan operation is not permitted during Risks for people (including the build phase.
Page 9
5. Safety instructions WARNING DANGER Risk of injury when working at heights. Risks from parts which may affect the Use appropriate, certified climbing aids ventilation system which are added or (ladders). Stability should be ensured, if modified at a later date. Parts (range necessary have the ladders steadied by a hood, air-ventilated fireplace etc.) which are 2nd person.
Page 10
5. Safety instructions DANGER DANGER of fire spreading Danger of electric shock. Before removing the housing cover and In the event of a fire, there is a risk before installing the electrics, switch off all of the fire spreading supply circuits as well as the mains fuse ●...
Certificates of approval are available on request or on our website Control model F www.maico-ventilatoren.com. The Barrier-free unit. The fan switches on once approval number can be seen on the the room lighting is activated. The fan can TÜV sticker/conformity mark [S3].
*** ER-UPB can be used inside the shaft, con- nection duct made from flexible aluminium For ER radio fans and Maico smart duct, second room connection made from ER 100 RC instructions. steel folded spiral-seams duct.
Page 14
● Cover with exhaust air filter. Trouble-free 7.4.3 Recess-mounted housing ER-UPD filter exchange without using tools. ● Can be combined with Maico aeroduct or ● It is possible to rotate the cover by ± 5° to Saint-Gobain-Gussrohr PAM-Global RML. compensate for housings which have been ●...
Page 15
● RC model with radio electronics: (50 sec.) and overrun time (6 min.). Use in radio-controlled ventilation system ● G model: With base load circuit. MAICO smart. Based on EnOcean Continuous operation at 35 m³/h, high technology. Network-compatible (master- speed...
Page 16
VZ 24 C board 0…150 1.5…24 5 x 1.5 ER 60 F, ER 100 F F board 3 x 1.5 ER 60 G, ER 100 G G board 5 x 1.5 ER 60 GVZ G board + 5 x 1.5 ER 100 GVZ...
EN 55014-2 room. Ambient temperature - 10 to + 60 °C. (depending on pulse form and energy factor Maico accepts no liability for corrosion 1000 to 4000 V). These values can be damage caused by improper storage, exceeded when operating with fluorescent e.g.
11. Installation preparations 11. Installation preparations Suitable mounting material is to be supplied by the customer. 11.1 Requirements in line with approval ER-UP/G + ER-UPD + ER-UPB + ER-UPB ER 60/100/ ER 60/100/ ER 60/100 Second room Second room Second room Number of units Max.
Page 20
11. Installation preparations ER-UP/G + ER-UPD + ER-UPB + ER-UPB ER 60/100/ ER 60/100/ ER 60/100 Second room Second room Second room max. 2 x 90° Number of duct elbows permitted for wall installation max. 2 x 90° Number of duct elbows permitted for ceiling...
11. Installation preparations resistant to deformation (e.g. concrete, 11.2 Preparations for wall installation cement mortar, fire protection filler). Suction duct for second room connection on ER-UP/G: Flexible aluminium duct NOTICE AFR 75/AFR 80 ER-UPD: Flexible aluminium duct Damage to unit, malfunctioning in the AFR 75/AFR 80 event of corrosion damage from mortar.
11. Installation preparations 5. Connect connection duct [18], suitable for 11.3 Ceiling installation preparations the ER-UP housing, to the main duct and Suction duct for second room connection on seal for ventilation. ER-UP/G: Flexible aluminium duct 6. Cut connection duct [19] to length, note a AFR 75/AFR 80 maximum duct length of 2 m.
Page 23
11. Installation preparations Main duct (steel folded spiral-seams Duct attachment with duct clamp, duct) alternatively duct attachment with clamping band Connection duct ER-UPB, ER-UPD: Steel folded spiral- seams duct ER-UP/G: Flexible aluminium duct Floor ceiling Steel threaded rod / stair bolt Duct attachment ...
11. Installation preparations 3. For a second room connection, produce 11.4 Preparations for the electrical the opening in the wall or shaft for the connection suction duct [9]. Note installation positions for the second room connection. DANGER 4. Correctly attach main ventilation duct [18] inside the shaft.
11. Installation preparations If installing on the wall with air outlet 11.5 Preparing the shut-off direction (exhaust socket) to the left device/shutter or right, note the following. Before mounting the housing, always Install shutter [1] turned 90° ( Fig. 6, ●...
Page 27
11. Installation preparations 11.5.2 Fire protection shut-off device NOTICE ER-UPD and ER-UPB housing Unpleasant odours from the main duct. The fire protection shut-off device does not close fully sealed if incorrectly installed. Before installation check and ensure that the installation position is correct and the the trigger equipment is fully functional.
12. Installation ‒ ER-UP/G The ER-UP/G housing must be inserted 12. Housing installation without any distortion. Failure to do so will mean that the fan insert cannot engage ● ER-UP/G housing correctly in the ER-UP/G housing and the ● ER-UPD housing degree of protection stated on the rating ●...
Page 29
12. Installation ‒ ER-UP/G - single room 3. Mark fixing holes for mounting support on Exhaust socket with plastic shutter rear shaft wall, produce holes and insert 18 Main duct, steel folded spiral-seams duct dowels. Suitable mounting material is to 19 Connection duct, flexible aluminium duct be supplied by the customer.
Page 31
12. Installation ‒ ER-UP/G - single room DANGER DANGER Fire may spread if connection duct [19] Risk of short-circuits and damage to is incorrectly installed. unit. If the cable grommet [39] is not installed correctly, water may penetrate Only use permitted cable sheathing the ER-UP/G housing.
Page 32
12. Installation ‒ ER-UP/G ‒ second room Protective grille 2. Place installation socket [10] in ER-UP/G housing. The edge of the socket must click Filter mat, filter class G2 into place on the wall of the housing. Adapter Suction duct, second room connection: 3.
Page 33
12. Installation ‒ ER-UP/G ‒ second room Protective grille 12.1.7 Ceiling installation ER-UP/G ‒ Filter mat, filter class G2 second room Adapter Observe mounting instructions in chapter Suction duct, second room connection: 12.1.2. flexible aluminium duct AFR 75/AFR 80 1. Mount ER-UP/G housing on ceiling as Installation socket for second room described in chapter 12.1.5.
12. Installation ‒ ER-UPD Break open one of the housing segments [S] 12.2 Installation of ER-UPD housing to use the second room connection set ER-ZR. 12.2.1 Impermissible connections on Use expanded rubber ER-MO for acoustic ER-UPD housing insulation of thin ceilings capable of reso- The following are not permitted: nance (...
Page 35
12. Installation ‒ ER-UPD - single room Metal exhaust socket with shut-off shutter 5. Locate ER-UPD housing in the desired 18 Main duct, steel folded spiral-seams duct position and fix it to the ceiling with two 19 Connection duct, steel folded spiral- mounting supports.
Page 37
12. Installation ‒ ER-UPD - second room Protective grille 1. Cut out the desired housing segment "S" (left, right or bottom) at the marking with Filter mat, filter class G2 a knife. Adapter 2. Place plastic installation socket [10] in Suction duct, second room connection: ER-UP/G housing.
12. Installation ‒ ER-UPB 12.3 Installation of ER-UPB housing 12.3.3 Important information about plastering 12.3.1 Impermissible connections on DANGER ER-UPB housing Fire may spread if ER-UPB housing is The following are not permitted: incorrectly installed. ● Second room connection with an ER 60 ...
Page 39
12. Installation ‒ ER-UPB - single room Metal exhaust socket with shut-off shutter DANGER 18 Main duct, steel folded spiral-seams duct Fire may spread if connection duct [19] 19 Connection duct, flexible aluminium duct is incorrectly installed. AFR Ø75/80 Only use permitted cable sheathing 20 Power cable (...
Page 40
12. Installation ‒ ER-UPB - second room 5.1 Steel connection socket Ø 75/80 12.3.5 ER-UPB/R, ER-UPB/L and for second room extraction on ER-UPB ER-UPB/U installation (second room) Protective grille 1. Install ER-UPB housing as described in Filter mat, filter class G2 chapter 12.3.4.
13. Electrical connection 13. Electrical connection DANGER Danger to life from electric shock. 20 Power cable The unit will be damaged if installed 39 Cable grommet incorrectly with too long a power cable. 42 Terminal box If the cable feed is too long inside the housing, the fan insert cannot be To prevent the fan and/or electric installed correctly.
Page 43
13. Electrical connection 13.1.1 Connect the unit electrically NOTICE 1. Switch off mains fuse, secure and fit The unit will be damaged through warning sign. contact with components at risk of ESD on the electronics board of VZ, VZ 15, 2.
14. Installation of fan insert and cover 14. Installation of fan insert and cover 14.1 Settings on electronic circuit boards Information ● Electronic circuit boards [12] of the ER Electronic circuit boards ER 60 H and variants standard, D, VZ, VZ 15, G, GVZ ER 100 H and F have no setting options.
14. Installation of fan insert and cover Two control variants can be implemented 14.2 Installing fan insert/exhaust air with the ER 60 GVZC EC control: element Fig. 16 ● Permanent base load with connectible The ER fan insert / The Centro exhaust air rated load (standard circuit).
Page 46
14. Installation of fan insert and cover 11 Fan insert Note wiring diagrams in box base. 12 Electronic circuit board (control) Cables must not prevent the fan from 13 Housing floor seal being slid in. 38 Plaster protective cover 42 Terminal box Lever [44] and stud 43 Optional fixing with screws [45] must engage.
If installing on a wall, ensure that the Maico name is in the bottom right. ● If the housing edge is flush with the plaster, use central screw [15.1], M6 x 16 mm, to secure the cover.
Filter mats ZF 60/100: Pack of 5, filter class G2 in accordance with EN 779, Art. no. 0093.0680 Should you have any questions Maico Elektroapparate-Fabrik GmbH Steinbeisstraße 20 78056 Villingen-Schwenningen Germany Tel. +49 7720 694 445 Fax +49 7720 694 175...
17. Extraction socket ER-AS for WC odour extraction ER-UP/G and ER-UPD housing units can be 17. Extraction socket ER-AS for connected to the WC flushing pipe using the WC odour extraction ER-AS extraction socket. A Ø 70 duct cross section facilitates low air speeds in the connecting duct and an effective, draft-free extraction of odours.
18. Fault rectification 18. Fault rectification Fault Cause, measure Fan is too loud. ● Dirty filter. ● Call on the services of a trained electrician Replace filter. any time there is a fault. ● Fan insert incorrectly ● Repairs should only be carried out by a inserted.
G2 according to compliance with the regulations valid in the EN 779 country where you are. Should you have any questions Maico Elektroapparate-Fabrik GmbH Steinbeisstraße 20 78056 Villingen-Schwenningen, Germany Tel. +49 7720 694 445 Fax +49 7720 694 175 E-mail: ersatzteilservice@maico.de...
22. Wiring diagrams ER 60 and ER 100, Centro-E 22. Wiring diagrams The fan starts up after switching on the room Tolerances for the times stated lighting (with switch S1). The fan also below = nominal value + 20 %. switches off after the room lighting has been turned off.
Page 56
22. Wiring diagrams ER 60 F, ER 100 F ER 60 F, ER 100 F Standard switching: With light control. The ER 60 F and ER 100 F are designed for installation in windowless, dark rooms. The fan is switched on wirelessly through the brightness of the room lighting by a light control unit.
Page 57
ER 60 G, ER 100 G The ER 60 G and/or the ER 100 G can be operated in base or full load operation as required. S1 Switch for base load operation: Continuous operation at a lower speed with lower air volume.
Page 58
22. Wiring diagrams ER 60 GVZ, ER 100 GVZ ER 60 GVZ, ER 100 GVZ Standard switching: Fan always runs at base load. When the room is in use (S1=On), the fan switches automatically to full load after approx. 50 seconds. Switching option When the room is in use (S1=On), the fan switches automatically to full load after...
Page 59
22. Wiring diagrams ER 60 GVZC EC ER 60 GVZC EC switching option Switching option The base load can be switched on and off with S2. ● Case 1: Fan is stationary. If S2 is activated (S2 = On), the unit switches immediately to base load, without considering the preset start delay.
Page 61
Then the operating stage selected by the RLS RC is adopted. The base load is permanently activated in the factory using a DIP switch. Maico Elektroapparate-Fabrik GmbH • Steinbeisstr. 20 • 78056 Villingen-Schwenningen • Germany • Service +49 (0) 7720 694-0 • technik@maico.de...
Page 62
СМОТРИТЕ ТАКЖЕ Канальные Реверсивные Комплектующие Вытяжные вентиляторы вентиляторы вентиляторы вентиляции Установка Проектирование систем Кухонные вытяжных Воздуховоды вентиляции вытяжки вентиляторов Воздухораспределительные устройства...