Leave soil that drifts over the side of the bucket for
final cleanup.
One lengthwise cleanup pass will usually leave the
backfill at an acceptable grade.
When backfilling from a large pile, shovel off the top of
the pile, pushing toward the excavation. Drag some soil
rearward to form a work ramp of convenient grade.
When backfilling on a slope, have the soil piled on the
high side for easier backfilling.
LOADING FROM A STOCKPILE
Initially approach the stockpile with the bucket approx-
imately to feet (609.6 mm) off of the ground. Lower the
bucket to ground level when the stockpile height has been
reduced so the bucket will break out easily.
Keep an area clean so the truck or trailer can back in
close to the work area. This will minimize travel distance
from the pile to the truck. Keep the truck in close and
work around the pile.
LOADING FROM A BANK
Select the highest forward gear that provides the most
efficient loading operations without going into a "stall."
For faster loading, maintain a 45° turn angle, and work
as close to the truck as possible.