True TDB-24-48-1-G-1-HC Installation Manual page 12

Underbar refrigeration
Hide thumbs Also See for TDB-24-48-1-G-1-HC:
Table of Contents

Advertisement

Cabinet Setup (cont.)
Procedure (cont.)
5. Install the draft tower handles. See fig. 6.
6. Position the chill hose.
7. Remove the draft tower top. See fig. 7.
8. Hook the air hose clip to the top of the insulation sleeve.
See figs. 8a and 8b.
9. Reinstall the draft tower top.
10. Attach the pressure regulator to the CO₂ cylinder. See fig. 9.
NOTE: Fill the CO₂ cylinder before installation. DO NOT lay
CO₂ cylinders flat. DO NOT drop CO₂ cylinders.
11. Clamp the clear vinyl hose onto the pressure regulator.
See fig. 9.
12. Position the CO₂ cylinder inside the cabinet, and fasten the
safety strap around the cylinder. See fig. 10.
13. Attach the tapper to the keg. See fig. 11.
14. Connect the clear vinyl hose to the tapper. See fig. 11.
15. Open the pressure regulator valve and pressurize the system.
16. It requires 1/2 lb (0.23 kg) of CO₂ to dispense a half-barrel of
beer at 38˚F (3.3˚C) with 15 psi (1.03 bar) of pressure on the
barrel.
17. Check the connection points for leaks. If the system leaks,
verify all fittings and clamps are tight and seal correctly.
18. Connect the beer lines to the tapper.
19. Engage the tapper. See fig. 12.
20. Position the keg inside the cabinet.
Page 12 of 28
U N D E R B A R R E F R I G E R A T I O N
Fig. 6. Screw the handles on.
Fig. 8. Route the chill hose into the draft tower from below (A) and hook it on the
top of the insulation sleeve (B).
Fig. 9. Installed pressure regulator
and air hoses.
03/1/2023
Fig. 7. Lift the top off the draft tower.
A
Fig. 10. Always strap the CO₂
cylinder into the cabinet.
P#975552
truemfg.com
B
TEC_TM_114 | REV. C | EN

Advertisement

Table of Contents
loading

This manual is also suitable for:

Td-50-18-s-hcTbb-2-hcTbb-3g-s-hcTdd-4-hc

Table of Contents