Leica GS09 User Manual page 60

Hide thumbs Also See for GS09:
Table of Contents

Advertisement

GS09, Setting Up and Starting Up
Step
Description
Check that the tribrach is still correctly positioned and levelled.
Hang the external battery onto a tripod leg.
Take the Y-cable.
Attach the connectors with the 8 pin plug to GS09 antenna and to
CS09 field controller.
Attach the connector with the 5 pin plug to the external battery
(internal batteries can also be used for powering GS09 antenna/CS09
field controller).
Turn on GS09 antenna and CS09 field controller.
Configuring the Raw Data Logging
2.
Select Main Menu:
Determine during what circumstances raw observations are logged
(Static Only or Static & Moving).
Determine the rate at which raw observations are logged.
3.
Starting Up with the Survey Program
,
,
60

Advertisement

Table of Contents
loading

Table of Contents