Hach 9523sc User Manual page 15

Dccp system
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
Terminal
L
Hot or phase (L)
N
G
Protective earth ground (G)
3.4 Plumbing
3.4.1 Connect the sample water and cooling water
Note: Do not install metric equivalent tubing, pipes or fittings on the instrument. Leaks can occur.
Items to collect:
• Shutoff valve (3x)
• ¼-inch tubing OD
3
/
-inch tubing ID
8
• Tubing clamp
1. Use ¼-inch tubing and three shutoff valves to connect the sample water and cooling water. Refer
to
Figure
7.
3
2. Use the supplied
drain. Refer to
Figure
Notes:
• Do not connect cooling water to instruments with the regenerative cooling option. Instruments
with the regenerative cooling option do not have a cooling water inlet or outlet.
• Refer to
Specifications
• Make sure to use a back pressure regulator or a head cup to control the sample water
pressure and keep a constant sample flow rate.
• Keep the operating temperature of the sample flow as constant as possible for best
performance.
• For the best results, use a temperature-controlled cooling water source that keeps the cooling
water at 25 °C (77 °F).
• Make the drain lines as short as possible.
• Make sure that the drain lines have a constant slope down.
• Make sure that the drain lines do not have sharp bends and are not pinched.
• Make sure that the drain lines are open to air and are at zero back pressure.
Table 1 Wiring information—AC power
Description
Neutral (N)
/
-inch ID tubing and tubing clamp to connect the condensate drain to an open
8
7.
on page 3 for the cooling water and sample water specifications.
Color—North America
Black
White
Green
Color—EU
Brown
Blue
Yellow with green stripe
English 15

Advertisement

Table of Contents
loading

This manual is also suitable for:

9525.99.0011

Table of Contents