Hach 9523sc User Manual page 10

Dccp system
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
2.5 Customer-supplied parts
Before installation, collect the components that follow. Refer to
Figure 4 Customer-supplied parts
1 Sample plumbing parts
2 Shutoff valve
3 Tubing, ¼-inch OD
4 Cooling water plumbing parts
5 Shutoff valves (2x)
Section 3 Installation
Multiple hazards. Only qualified personnel must conduct the tasks described in this
section of the document.
3.1 Installation guidelines
Install the instrument:
• In a clean, dry, well-ventilated and temperature-controlled location. Refer to the operating
temperature and humidity specifications in
• In a location with no mechanical vibrations and electronic noise.
• As close to the sample source as possible to decrease analysis delay.
• Near an open drain.
• Away from direct sunlight and heat sources.
• So that the power switch is visible and easily accessible.
• In a location where there is sufficient clearance around it to make plumbing and electrical
connections. Refer to
3
Not applicable to instruments with the regenerative cooling option.
10 English
3
3
Figure 5
on page 12.
Figure
6 Tubing, ¼-inch OD
7 Electrical parts
8 110/120 VAC: Wire conductors, 3.31 mm
(12 AWG)
9 220/240 VAC: Wire conductors, 2.08 mm
(14 AWG)
10 Conduit fitting for main power
D A N G E R
Specifications
on page 3.
4.
3
2
2

Advertisement

Table of Contents
loading

This manual is also suitable for:

9525.99.0011

Table of Contents