If the photovoltaic installation is made up of
10 panels of 440 W each, the power of the solar
field will be 440 x 10 = 4,400 Wp = 4.4 kWp.
You have to enter the price per kWh consumed
from the grid. For example, the retailer in this
example charges a price of
The price at which the retailer compensates
for the kWh discharged into the grid must be
entered. For example, the retailer in this example
compensates it at a price of
Fig. 46. Creating the plant.
Once all the values have been entered, press the "Create plant"
button.
Next, the app will indicate that the plant has been successfully
created by means of a message at the bottom and a new header
will appear in the "My plants" panel:
7.3.3. "12h" Monitoring (Day).
This monitoring mode only works during the hours of solar
irradiance in which the inverter is running.
While the inverter is off, the app will not receive generation or
consumption data.
7.3.3.1. Electrical diagram of the installation.
Make sure that the installation is as shown on the diagram in
section 6.6. of page 19.
76
Chalet Pirineos
Residencial
GMT +01:00 Amsterdam, Berlin
Euros (€)
0.14721
€/kWh.
0.0537
€/kWh.
SALICRU

Advertisement

Table of Contents
loading

This manual is also suitable for:

Equinox eqx2 5002-tEquinox eqx2 6002-tEquinox eqx2 8002-tEquinox eqx2 10002-tEquinox eqx2 12002-tEquinox eqx2 15002-t ... Show all

Table of Contents