Salicru EQUINOX EQX2 4002-T User Manual page 31

Three-phase solar inverters connected to the grid
Hide thumbs Also See for EQUINOX EQX2 4002-T:
Table of Contents

Advertisement

7.3.3.2. Configuring the installation on the app.
The inverter must be powered through the solar field at all times throughout the entire process.
Click on the plant that has been created to access its details:
For the time being, only the power of the solar
field that has been entered will be displayed
because the measurement instruments are not yet con-
nected; this will be shown with the "Devices offline"
message on the top of the synoptic chart.
The ESM1 EQX network analyser is already
physically connected to the 485/WiFi 24H EQX
communication module, so it will only be necessary to
link the latter.
Add a device to the plant that has been created: press the
"properties" button [ ], to the right of the plant title.
USER MANUAL
EQX2 SOLAR INVERTERS CONNECTED TO THE GRID
77

Advertisement

Table of Contents
loading

This manual is also suitable for:

Equinox eqx2 5002-tEquinox eqx2 6002-tEquinox eqx2 8002-tEquinox eqx2 10002-tEquinox eqx2 12002-tEquinox eqx2 15002-t ... Show all

Table of Contents