Removing Field Wiring Resistance Errors In 2-Wire Ohms Measurements - HP E1312A User Manual

Table of Contents

Advertisement

Removing Field
Wiring Resistance
Errors
in 2-Wire Ohms
Measurements
30 HP E1312A/E1412A Multimeter Application Information
Field wiring can cause an offset error in 2-wire resistance measurements.
You can use the following procedure to minimize offset errors associated
with field wiring resistance in 2-wire ohms measurements. You short the
field wiring at the DUT location and measure the 2-wire lead resistance.
This value is subtracted from subsequent DUT 2-wire ohms measurements.
There are two ways to effectively null out the lead resistance. The first way
is to characterize your field lead resistance by shorting the leads at the DUT
location and measure and record the lead resistance. Then enable the math
operation and store the 2-wire lead measurement value using the
CALCulate:NULL:OFFSet <
do this).
The following program shows SCPI examples used to store a
CONF:RES
Short the lead resistance at the DUT location.
READ?
Enter lead resistance value into computer.
CALCulate:FUNCtion NULL
CALCulate:STATe ON
CALCulate:NULL:OFFSet <
Subsequent 2-wire ohms measurements will subtract the null offset value
from the measurement thereby removing the lead resistance from the
measurement.
The second way to store the 2-wire lead resistance as the
is to let the multimeter automatically do this with the first measurement. The
first measurement made after
STATe
is set to
ON
stores the measured value as the null offset.
CONF:RES
Short the lead resistance at the DUT location.
CALCulate:FUNCtion NULL
CALCulate:STATe ON
READ?
Enter lead resistance value into computer. The value is automatically
stored in the multimeter's null offset register.
Remove the short from the lead resistance at the DUT location
and connect leads to your DUT.
READ?
Enter lead resistance value into computer. The NULL value is
subtracted from the measurement to more accurately provide the
DUT resistance.
value
>
command (
CALC:STATe
Set to 2-wire ohms function.
Measure the 2-wire ohms lead resistance.
Set math operation to NULL.
Turn math operation ON.
value
>
Store the NULL offset value.
function is set to
CALCulate
Set to 2-wire ohms function.
Set math operation to NULL.
Turn math operation ON.
Measure the 2-wire ohms lead resistance.
Make a 2-wire ohms resistance measurement.
must be
ON
to
value.
NULL
NULL
offset value
and the
NULL
Chapter 2

Advertisement

Table of Contents
loading

This manual is also suitable for:

E1412a

Table of Contents