Overview; Kit Contents; Hardware Included With Opt3002Evm Kit - Texas Instruments OPT3002EVM Operation Manual

Table of Contents

Advertisement

www.ti.com
1

Overview

The
OPT3002
is an ambient light sensor (ALS) with a digital output integrated circuit. The OPT3002 uses
a two-wire interface that works with the I
OPT3002EVM is a platform for evaluating the performance of the OPT3002 under various conditions. The
OPT3002EVM consists of two PCBs. The first PCB is the
computer, provides power, and sends and receives appropriate digital signals. The second PCB is the
OPT3002 test board that contains the OPT3002 device and its support circuitry.
1.1

Kit Contents

Table 1
summarizes the contents of the OPT3002EVM kit.
the
Texas Instruments Worldwide Customer Support Center
highly recommended that you also check the
verify you have the latest versions of the released software.
SBOU160 – May 2016
Submit Documentation Feedback
2
C protocol, making this device ideal for many applications. The
OPT3002 product folder
Table 1. Kit Contents
Item
OPT3002 test board
SM-USB-DIG board
USB extension cable
Figure 1. Hardware Included With OPT3002EVM Kit
Copyright © 2016, Texas Instruments Incorporated
SM-USB-DIG
board that communicates with the
Figure 1
shows the included hardware. Contact
nearest you if any component is missing. It is
on the TI web site at www.ti.com to
Quantity
1
1
1
OPT3002EVM User's Guide
Overview
3

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the OPT3002EVM and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents