This user's guide describes the characteristics, operation, and use of the OPT3002 evaluation module
(EVM). This user's guide discusses how to set up and configure the software and hardware, and reviews
various aspects of the program operation. Throughout this document, the terms evaluation board,
evaluation module, and EVM are synonymous with the OPT3002EVM. This document also includes an
electrical schematic, printed circuit board (PCB) layout drawings, and a parts list for the EVM.
Windows, Windows 7 are registered trademarks of Microsoft Corporation.
SPI is a trademark of Motorola Inc.
All other trademarks are the property of their respective owners.
SBOU160 – May 2016
Submit Documentation Feedback
OPT3002EVM User's Guide
Copyright © 2016, Texas Instruments Incorporated
User's Guide
SBOU160 – May 2016
OPT3002EVM User's Guide
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the OPT3002EVM and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Texas Instruments OPT3002EVM

  • Page 1 Throughout this document, the terms evaluation board, evaluation module, and EVM are synonymous with the OPT3002EVM. This document also includes an electrical schematic, printed circuit board (PCB) layout drawings, and a parts list for the EVM.
  • Page 2: Table Of Contents

    Hardware Included With OPT3002EVM Kit ......................Hardware Setup ..................OPT3002 Test Board Block Diagram ....................Typical Hardware Connection ..........Typical Response After Connecting OPT3002EVM to the Computer ................OPT3002EVM Software-Installation Launch ....................Software-Installation Prompts ..................... Main Operation Screen ....................Hardware Error Message ......................
  • Page 3: Overview

    I C protocol, making this device ideal for many applications. The OPT3002EVM is a platform for evaluating the performance of the OPT3002 under various conditions. The OPT3002EVM consists of two PCBs. The first PCB is the...
  • Page 4: Related Documentation From Texas Instruments

    The following documents provide information regarding Texas Instruments' integrated circuits used in the assembly of the OPT3002EVM. This user's guide is available from the TI web site under literature number SBOU160. Any letter appended to the literature number corresponds to the document revision that is current at the time of the writing of this document.
  • Page 5: Theory Of Operation

    Figure 3. OPT3002 Test Board Block Diagram Hardware Overview If not already assembled, the basic hardware setup for the OPT3002EVM involves connecting the OPT3002 test board to the SM-USB-DIG Platform, and then connecting the USB cable. This section presents the details of this procedure.
  • Page 6: Typical Hardware Connection

    ® Figure 5. Typical Response After Connecting OPT3002EVM to the Computer In some cases, the Add Hardware Wizard appears. If this installation prompt occurs, allow the device manager to install the human interface device drivers by clicking Yes at each request to install the drivers.
  • Page 7: Software

    The OPT3002EVM software is available through the OPT3002EVM Product Folder on the TI web site (www.ti.com). To install the software to your computer, launch the OPT3002EVM installation file, setup_OPT3002_EVM.exe. The OPT3002EVM software then begins the installation process, as shown in Figure Figure 6.
  • Page 8: Launching The Software

    With the OPT3002EVM properly connected (see Figure 4), launch the EVM GUI software from the Windows Start menu by navigating to the folder titled Texas Instruments and clicking on the OPT3002 EVM application. The software launches with a screen similar to that shown in Figure Figure 8.
  • Page 9: Software Operation

    SM-USB-DIG tab in the GUI software, as shown in Figure 10. The GUI has a primary window that is used to configure and read from the OPT3002EVM, along with a secondary window used to access different features of the OPT3002EVM. Figure 10. Power Indicators...
  • Page 10: Register X00 Button And Recorded Values

    Figure 12. Click the Read Reg x00 button to update these fields and the plot with the latest values from the OPT3002EVM. Figure 12. Register x00 Button and Recorded Values Register x01 configures the OPT3002 device and provides feedback about the state of the device; the bit...
  • Page 11: Weighted Lsb Vs. Sample Number Plot

    17. To access the plot axis range and formatting, right-click the plot. Figure 16. Weighted LSB vs. Sample Number Plot Figure 17. Re-Initialize Button SBOU160 – May 2016 OPT3002EVM User's Guide Submit Documentation Feedback Copyright © 2016, Texas Instruments Incorporated...
  • Page 12: Schematic, Pcb Layout, And Bill Of Materials

    Also, no additional LEDs are installed on the test board in order to reduce total ambient light around the device. The back side of the board is mostly planar; mounting holes are included to accommodate evaluation. OPT3002EVM User's Guide SBOU160 – May 2016 Submit Documentation Feedback Copyright © 2016, Texas Instruments Incorporated...
  • Page 13: Pcb Layout

    Figure 23 show the assembly drawings of the top and bottom PCB layers, respectively. Figure 20. PCB Top Layer Figure 21. PCB Bottom Layer SBOU160 – May 2016 OPT3002EVM User's Guide Submit Documentation Feedback Copyright © 2016, Texas Instruments Incorporated...
  • Page 14: Bill Of Materials

    RES, 10k ohm, 5%, 0.125W, 0805 CRCW080510K0JNEA Vishay Dale RES, 0 ohm, 5%, 0.125W, 0805 CRCW08050000Z0EA Vishay Dale Light Sensor, DNP0006A OPT3002DNP Texas Instruments OPT3002EVM User's Guide SBOU160 – May 2016 Submit Documentation Feedback Copyright © 2016, Texas Instruments Incorporated...
  • Page 15 STANDARD TERMS AND CONDITIONS FOR EVALUATION MODULES Delivery: TI delivers TI evaluation boards, kits, or modules, including any accompanying demonstration software, components, or documentation (collectively, an “EVM” or “EVMs”) to the User (“User”) in accordance with the terms and conditions set forth herein. Acceptance of the EVM is expressly subject to the following terms and conditions.
  • Page 16 FCC Interference Statement for Class B EVM devices NOTE: This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation.
  • Page 17 【無線電波を送信する製品の開発キットをお使いになる際の注意事項】 開発キットの中には技術基準適合証明を受けて いないものがあります。 技術適合証明を受けていないもののご使用に際しては、電波法遵守のため、以下のいずれかの 措置を取っていただく必要がありますのでご注意ください。 1. 電波法施行規則第6条第1項第1号に基づく平成18年3月28日総務省告示第173号で定められた電波暗室等の試験設備でご使用 いただく。 2. 実験局の免許を取得後ご使用いただく。 3. 技術基準適合証明を取得後ご使用いただく。 なお、本製品は、上記の「ご使用にあたっての注意」を譲渡先、移転先に通知しない限り、譲渡、移転できないものとします。 上記を遵守頂けない場合は、電波法の罰則が適用される可能性があることをご留意ください。 日本テキサス・イ ンスツルメンツ株式会社 東京都新宿区西新宿6丁目24番1号 西新宿三井ビル 3.3.3 Notice for EVMs for Power Line Communication: Please see http://www.tij.co.jp/lsds/ti_ja/general/eStore/notice_02.page 電力線搬送波通信についての開発キットをお使いになる際の注意事項については、次のところをご覧くださ い。http://www.tij.co.jp/lsds/ti_ja/general/eStore/notice_02.page SPACER EVM Use Restrictions and Warnings: 4.1 EVMS ARE NOT FOR USE IN FUNCTIONAL SAFETY AND/OR SAFETY CRITICAL EVALUATIONS, INCLUDING BUT NOT LIMITED TO EVALUATIONS OF LIFE SUPPORT APPLICATIONS.
  • Page 18 Notwithstanding the foregoing, any judgment may be enforced in any United States or foreign court, and TI may seek injunctive relief in any United States or foreign court. Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2015, Texas Instruments Incorporated...
  • Page 19 IMPORTANT NOTICE Texas Instruments Incorporated and its subsidiaries (TI) reserve the right to make corrections, enhancements, improvements and other changes to its semiconductor products and services per JESD46, latest issue, and to discontinue any product or service per JESD48, latest issue.
  • Page 20 Mouser Electronics Authorized Distributor Click to View Pricing, Inventory, Delivery & Lifecycle Information: Texas Instruments OPT3002EVM...

Table of Contents