Overview - Siemens SIPART PS2 Operating Instructions Manual

Hide thumbs Also See for SIPART PS2:
Table of Contents

Advertisement

When operating the positioner with natural gas, you must follow and adhere to the following
safety notes:
Operation with natural gas
1. Only positioners and option modules which are connected to power supplies with type of
2. Do not operate the positioner with natural gas in closed spaces.
3. Natural gas is continuously blown off, depending on the model. Special care must therefore
4. If you operate the positioner with natural gas, it is not permitted to use Mechanic Limit
5. You must depressurize devices operated with natural gas adequately for maintenance work.
Note
Quality of natural gas
Only use natural gas which is clean, dry and free from additives.
5.2

Overview

Note
• During the initialization process, the operating pressure must be at least one bar more than
that required to close or open the valve. However, the operating pressure should not be
greater than the maximum permissible operating pressure for the actuator.
General information about commissioning
1. After installing the positioner on a pneumatic actuator, you must supply electric and
pneumatic auxiliary power to it.
2. The positioner is in the "P manual mode" before initialization. At the same time, "NOINI"
blinks in the lower line of the display.
3. Position feedback: You can adjust the range of position detection using the friction clutch if
necessary.
4. Adjust the positioner as per the respective actuator with the help of the initialization process
and by setting the parameters. If required, use the "PRST" parameter to cancel the adjustment
of the positioner on the actuator. The positioner is again in the "P manual mode" after this
process.
SIPART PS2 (6DR5...)
Compact Operating Instructions, 11/2022, A5E03436620-AG
WARNING
protection "Intrinsic safety, protection level [ia]" may be operated with natural gas.
be taken during maintenance activities near the positioner. Always ensure that the
immediate surroundings of the positioner are adequately ventilated.
The maximum values for ventilation are listed in section "Natural gas as actuator medium
(Page 63)".
Switches (MLS).
Open the lid in an explosion-free atmosphere and depressurize the device for at least two
minutes.
Commissioning
5.2 Overview
41

Advertisement

Table of Contents
loading

Table of Contents