Daikin Modular T Pro ATB Installation, Use And Maintenance Manual page 29

Table of Contents

Advertisement

11
SIZES 6-7
Make the connections shown in the figure.
To facilitate understanding, the cables have been schematized outside the sections, in reality the connec-
tors are located inside the unit as shown in the previous figure.
• 2x - 6-pole BUS connector;
• 1x - fan supply 3-pole connector;
• 2x - tapping points plugs on the return air of the fan.
• connection cables to the electrical panel.
This connection is made
within section B3
6-pole
BUS connector
Connection cables to
the electrical panel
B
(for their wiring, see
3
the wiring diagram
supplied with the unit)
11
SIZE 6-7: electrical connections between sections
B
2
These connections are
made within section B1
6-pole
BUS connector
3-Pole
connector fan
supply
Tapping point
B
1
29

Advertisement

Table of Contents
loading

Table of Contents