Daikin Modular T Pro ATB Installation, Use And Maintenance Manual page 22

Table of Contents

Advertisement

PHASE 0: TRANSPORT OF THE UNITS TO THE PLACE OF INSTALLATION
Transport the units until they reach the place intended for installation.
The units must be transported with a transpallet or a forklift, suitable for the weight and
5
size of the package. The choice of the most appropriate means and way remains the
responsibility of the transport operator.
The figure on page 17 shows the correct forking direction of the unit according to the size and
sections; always make sure to keep the centre of gravity of the load balanced.
The operating area must be perfectly free from objects or people not involved in the transport.
Transport the equipment carefully, avoiding sudden manoeuvres and equipped with personal
protective equipment (gloves, safety shoes, etc.).
See page 17 to know the correct forking direction of the unit.
Lift the unit with the forks resting on its bottom,
not on the foot brackets
5
Correct transport of the unit
22