Daikin Modular T Pro ATB Installation, Use And Maintenance Manual page 25

Table of Contents

Advertisement

PHASE 2: FEET ASSEMBLY
Before positioning the unit, assemble the provided feet; do not use other types of
7
supports or try to modify the feet supplied.
To attach the feet
With a transpallet or with a forklift, suitable for the weight and dimensions of the unit, lift it as little as necessary to
carry out the assembly of the feet; during lifting,
It remains the responsibility of the transport operator to choose the most appropriate means and
way for lifting. The figure on page 17 shows the correct forking direction of the unit according to
the size and sections; always make sure to keep the centre of gravity of the load balanced.
After fitting the feet, check that the unit is perfectly level; if this condition is not verified, rotate the feet
until it is obtained (be careful not to unscrew the feet too much, risk of instability).
7
Positioning and levelling the unit
DO NOT tilt the unit or turn it
NEVER position yourself under the unit
over.
itself.
25

Advertisement

Table of Contents
loading

Table of Contents