Installation; Installation Procedure - Daikin Modular T Pro ATB Installation, Use And Maintenance Manual

Table of Contents

Advertisement

Installation

6
All installation, assembly, electrical connections to the mains and extraordinary maintenance
must be performed
in compliance with the regulations in force in the country the equipment is to be used and the
standards on the systems and safety in the workplace.
During installation, the area must be free from people and
objects not used for the assembly.
Before starting, make sure you have
all the necessary equipment.
Use only equipment that is in good
condition and undamaged.

Installation procedure

Before installation, read the safety instructions on the first pages of this manual. Contact the
Manufacturer if any points are unclear or not perfectly understandable. A check mark next to each step
will help to confirm complete and proper installation.
PHASE 0: TRANSPORT OF THE UNITS TO THE PLACE OF INSTALLATION
PHASE 1: UNIT CHECK AND SETTINGS
PHASE 2: FEET ASSEMBLY
PHASE 3: FITTING THE GASKET (ONLY SIZES 05-06-07)
PHASE 4: MECHANICAL UNION BETWEEN SECTIONS (ONLY SIZES 05-06-07)
PHASE 5: ELECTRICAL WIRING BETWEEN SECTIONS (ONLY SIZES 05-06-07)
PHASE 6: ROOM THERMOSTAT CONNECTION
PHASE 7: ELECTRICAL CONNECTIONS
PHASE 8: CONNECTION TO A DRAIN
PHASE 9: AERAULIC CONNECTIONS
PHASE 10: TESTING
After installation store this manual and the assembly sheet that accompanied the unit in a place that is
dry and clean. This way it will be accessible to operators in the future who need to consult it.
Do not remove, tear out or write on any part of this manual besides the spaces set aside for notes:
.........................................................................................................................................................................................................................................
2A
only by qualified personnel authorised by the Retailer or Manufacturer,
21