Daikin Modular T Pro ATB Installation, Use And Maintenance Manual page 27

Table of Contents

Advertisement

PHASE 4: MECHANICAL UNION BETWEEN SECTIONS (ONLY SIZES 05-06-07)
Pass all the cables through the holes provided and then join the various sections as shown in the
9
figure. Size 5 has two sections, sizes 6 and 7 have three sections.
1b
(sizes 06-07 only)
1a
2
2
3
9
SIZES 05-06-07: coupling of sections
27

Advertisement

Table of Contents
loading

Table of Contents