Check that the following have been planned at the installation site:
an electrical system compliant with current regulations and with specifications that meet the
A
needs of the unit;
B
a floor or wall drain, with siphon, connected to the sewer system;
C
an aeraulic system (ducts for the air to be conveyed to the rooms.
floor
Check that the
of the place chosen for installation is:
flat and without any
• perfectly
• vibration resistant;
able to support the weight of the equipment
(see technical data table on page 10).
A
6
System preparation
24
roughness;
B
considering an appropriate safety margin
C
B
B
B