Operation Pattern Settings - Toshiba RBP-RC001-E Installation & Owner's Manual

Group remote controller
Table of Contents

Advertisement

RBP-RC001-E Installation & Owner's Manual

Operation Pattern Settings

An MC (MC system) and UC system assignment for each GR system, operation mode, set temperature, demand setting, sensor
setting, and pattern link output can be collected into a single operation pattern. You can set up to 4 operation patterns.
During operation, select one of set operation patterns and issue commands to MCs in accordance with the settings of the
operation pattern selected for each system.
1
On the setting screen, select "Operation Pattern
Settings" and press [●] (Confirm).
2
Use [Λ] and [V] to select the pattern to change and
press [●] (Confirm).
3
Use [<] and [>] to select the setting to change and press
[●] (Confirm).
For information about what to set for each item and about how to change each
item, refer to the table on the next page.
4
To confirm the changes, press [ ] (Return) and on the
message screen, press [●] (Confirm).
30
32RCA001TS-02ISEN

Advertisement

Table of Contents
loading

Table of Contents