3.3 Route the cables to M100_210

- Without rain cover or protection, never perform any wiring or maintenance
operations under rainy conditions.
- After the wiring operations, please close the door immediately and fully
tighten both toggle latches.
Proper cable routing can avoid water dripping to cable glands and make the
sealing of the cable glands well. Please follow the requirements to lay cables
for M100_210.
1. Keep 10-20 cm length of straight cables from the edge of cable glands.
2. Anchor or support the straight cables to strain relief.
3. Must be routed to create a "hump" to prevent flowing water on the cable gland.
DANGER : ELECTRICAL HAZARD!!
>10
cm
>10
cm
Figure 3-11: Cable routing
>10
cm
>10
cm
27