Installation
External PE terminal
To ground the inverter, please crimp the grounding wire to the ring terminal lug
and fix it on the grounding point shown as figure 3-14.
* Screw: M8 (wall mount)
* Screw torque: M8/ 10 N•m (ground mount)
Figure 3-14: Mount the equipment grounding
32