Proper cable routing can avoid water dripping to cable glands and make the
sealing of the cable glands well. Please follow the requirements to lay cables
for M100A_280.
1. Keep 10-20 cm length of straight cables from the edge of cable glands.
2. Anchor or support the straight cables to strain relief.
3. Must be routed to create a "hump" to prevent flowing water on the cable gland.
>10
cm
>10
cm
Figure 3-11: Cable routing