Rack-Mounting Requirements; Installation Tools - HP A5820X Series Installation Manual

Hide thumbs Also See for A5820X Series:
Table of Contents

Advertisement

Table 4
Limits on harmful gases in the equipment room
Gas
Maximum concentration (mg/m
SO
0.2
2
H
S
0.06
2
NH
0.05
3
Cl
0.01
2

Rack-mounting requirements

Before rack-mounting a switch, make sure the rack meets the following requirements:
HP recommends that you mount a switch in an open rack. If you mount a switch in a closed rack,
make sure there is a good heat dissipation system.
Make sure the rack is steady enough to support the switch and accessories.
Make sure that the switch fits the rack size. Leave some spaces beside the left and right panels of the
switch for chassis heat dissipation.

Installation tools

Flat-blade screwdriver
Phillips screwdriver
ESD-preventive wrist strap
All these installation tools are user supplied.
3
)
3

Advertisement

Table of Contents
loading

This manual is also suitable for:

A5800 seriesA5800-48g-poe+A5800-48g-poe+ taaA5800-48gA5800-48g taaA5800af-48g ... Show all

Table of Contents