Rack-Mounting The Switch - HP FlexNetwork 5140 EI Series Installation Manual

Table of Contents

Advertisement

Figure 5 Attaching mounting bracket B to the power supply side mounting position (HPE
5140 24G SFP w/8G Combo 4SFP+ EI)
Figure 6 Attaching mounting bracket C (HPE 5140 8G 2SFP 2GT Combo EI)

Rack-mounting the switch

This task requires two people. To mount the switch in the rack:
1.
Wear an ESD wrist strap and make sure it makes good skin contact and is reliably grounded.
2.
Verify that the mounting brackets have been securely attached to the switch chassis.
3.
Install cage nuts in the mounting holes in the rack posts.
No cage nuts are provided with the switch. Prepare them yourself.
4.
One person holds the switch chassis and aligns the mounting brackets with the mounting holes
in the rack posts, and the other person attaches the mounting brackets to the rack with M6
screws.
M6 screws are provided only for switches shipped with mounting brackets. For switches not
shipped with mounting brackets, prepare M6 screws yourself.
5.
Verify that the switch chassis is horizontal and secure.
10

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hpe 5140 24g 4sfp+ eiHpe 5140 48g 4sfp+ eiHpe 5140 24g poe+ 4sfp+ eiHpe 5140 48g poe+ 4sfp+ eiHpe 5140 24g sfp w/8g combo 4sfp+ eiHpe 5140 24g poe+ 2sfp+ 2xgt ei ... Show all

Table of Contents