Preparing The Ccu For First Use; Initial Inspection; Power Supplies; Battery Charging - Envirosight Verisight Pro+ Original Instruction Manual

Table of Contents

Advertisement

Preparing the CCU for First Use

This section describes the process of getting the Verisight Pro+ pipeline inspection
system ready to use when you have just received it.

Initial Inspection

Inspect the shipping container for damage. If the shipping container or
cushioning material is damaged, keep it until you have verified that the contents
are complete and you have tested your Verisight Pro+ Pipeline Inspection System
mechanically and electrically.
The accessory case contains the accessories shipped with the Verisight Pro+
Pipeline Inspection System. If the contents of the accessory case are incomplete
or if the Verisight Pro+ Pipeline Inspection System does not operate as you would
expect, notify Envirosight or your nearest Envirosight Service Center. If the
shipping container is damaged or the cushioning material shows signs of stress,
also notify the carrier. Keep the shipping materials for the carrier's inspection.
Envirosight or the Envirosight Service Center will arrange for repair or
replacement without waiting for a claim settlement. If the shipping materials
are in good condition, retain them for possible future use. You may wish to ship
your Verisight Pro+ Pipeline Inspection System to another location or return it to
Envirosight or your nearest approved Envirosight Service Center for service.

Power Supplies

The Verisight Pro+ Pipeline Inspection System will operate from an external
12volt or 24volt DC power source or from internal batteries. The external power
source will also charge the internal batteries when connected. Operating the
unit while the batteries are being charged has no effect whatsoever on the time
taken to recharge the batteries.
The external power source must be 12 volts DC nominal and the unit may
consume up to 2.5 amps if operated while the internal batteries are being
charged.

Battery Charging

When you receive your Verisig ht Pro+ Pipeline Inspection System, the batteries
will be in a partially discharged state. It is recommended that the unit is fully
charged before use. The equipment may be used while the batteries are being
charged from a mains or vehicle battery supply, but should not be used on
internal battery supply until the batteries have been fully charged. To charge the
23
Envirosight Verisight Pro +
Version A

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Verisight Pro+ and is the answer not in the manual?

Related Products for Envirosight Verisight Pro+

Table of Contents

Save PDF