Check Operational Readiness - Peak PCAN-PC/104 Plus Quad User Manual

Four can channels, galvanic isolation for can connection
Hide thumbs Also See for PCAN-PC/104 Plus Quad:
Table of Contents

Advertisement

5. Install the slot brackets.
6. Reconnect the computer power supply.
7. Turn on the computer and start Windows.
Windows detects the new hardware and completes the driver installation.

3.3 Check Operational Readiness

1. Open the Windows Start menu.
2. Type Peak Settings and press |Enter|.
The window PEAK Settings appears.
3. Select CAN Hardware.
The connected CAN interface is displayed.
3 Installation
PCAN-PC/104 Plus Quad
User Manual 2.0.1
© 2022 PEAK-System Technik GmbH
12

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ipeh-002099

Table of Contents