Chapter
7
System test
General information
System test blocks
122
The system test screen consists of six blocks.
The first block is produced in the selftest. The rerun
of the test can only take place through a new selftest
(device restart).
The gas supply block is continually renewed.
The remaining system test blocks can be started
together or individually.
A system test block consists of:
▪
test name
▪
test content
▪
test result
–
traffic light display
–
alphanumeric value
▪
test start/stop button
The system test blocks can be started individually
only if the system test has been run completely once
before.