For Your Safety
Except for cups, do not place anything on top or above the machine.
The machine is not suitable for installation in an area where a water jet or water
spray might be used.
The machine must not be located on a surface that is sprayed or cleaned with a
water hose, steam jets, steam cleaner, or similar equipment.
The machine must be placed and levelled on a horizontal, water-resistant, heatproof,
and sturdy base capable of bearing its weight, see Technical data (page 22).
For operating, service and safety reasons the machine should be installed with a
clearance of not less than 50 mm at the back and sides from the building or non-
approved equipment. A minimum working space of 650 mm in front the coffee
machine and overhead clearance of at least 250 mm above the bean hoppers
are recommended. A clear height of 1000 mm for E'line, Enigma, Shotmaster and
accessories, 950 mm for Cameo machines and accessories (with high feet) and 900
mm for Légacy, Cameo machines and accessories (with standard feet) from the top
of the installation surface should be ensured. The height of the installation surface
above the floor is at least 800 mm. If the coffee machine connections are to be run
downwards through the counter, please make space for the lines, which can reduce
the usable space below the coffee machine.
The machine is only to be installed in locations where its use and maintenance is
restricted to trained personnel. Please refer to "Persons" (page 116).
Only connect the machine to the mains in accordance with the information on the
rating plate, see Rating plate of Légacy machines (page 17).
Adjustment of the frequency is automatic. No action is required.
The power cord must be in accordance with local regulations.
Voltage/current specifications are as listed in the table Electrical data and power
overview of Légacy machines (page 24).
To connect the machine to the water mains, use only the original supplied hoses.
Any necessary on-site preparatory work for electricity, water and drainage
connections at the customer's premises is to be arranged by the machine owner /
manager. The work must be carried out by authorised installation technicians in
compliance with general, country-specific and local regulations. Eversys service
organisations may only connect the machine to existing prepared connection points.
Eversys appointed service organisations are neither authorised, nor responsible for
carrying out any on-site installation work prior to connection.
The requirement prior to initial commissioning checklist is available under the
e'Support center (https://support.eversys.com/hc/en-us).
© Eversys S.A.
Page 10 of 133
02.01.2023
Need help?
Do you have a question about the Legacy L'2c and is the answer not in the manual?