Prepare The Installation Site - HP E3800-24G-2SFP+ Installation And Getting Started Manual

Hide thumbs Also See for E3800-24G-2SFP+:
Table of Contents

Advertisement

1. Prepare the Installation Site

Cabling Infrastructure - Ensure the cabling infrastructure meets the
necessary network specifications. See
in the appendices for more information.
Installation Location - Before installing the switch, plan its location and
orientation relative to other devices and equipment:
In the front of the switch, leave at least 7.6 cm (3 inches) of space for
the twisted-pair and fiber-optic cabling.
In the back of the switch, leave at least 3.8 cm (1 1/2 inches) of space
for the power cord. If you are stacking the switches, you will need 20
to 23 cm (approximately 8 to 9 inches), depending on the lengths of
the stacking cables being used.
On the sides of the switch, leave at least 7.6 cm (3 inches) for cooling,
except if the switch is installed in an open EIA/TIA rack.
Figure 2-1. Air flow direction of the E3800 switches
Installing the Switch
Installation Procedures
"Cabling and Technology Information"
2-5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents