HP E3800-24G-2SFP+ Installation And Getting Started Manual page 48

Hide thumbs Also See for E3800-24G-2SFP+:
Table of Contents

Advertisement

Installing the Switch
Installation Procedures
I m p o r t a n t
2-20
You must use the out-of-band console connection to minimally configure the
switch with an IP address and subnet mask before you can use an in-band or
out-of-band networked connection to manage the switch. Continue with
"Minimal Configuration Through the Console Port Connection" on page 3-2
for more information.
Console Cable Pinouts
The console cable has an RJ-45 plug on one end and a DB-9 female connector
on the other end.
Table 2-2
Figure 2-15. RJ-45 to DB-9 pinouts
5
4
3
2
1
9
8
7
6
Table 2-2.
Mapping of RJ-45 to DB-9
RJ-45 (Signal reference from
Chassis)
Reserved
1
Reserved
2
TXD
3
Reserved
4
GND
5
RXD
6
Reserved
7
Reserved
8
describes the mapping of the RJ-45 to DB-9 pins.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
DB-9 (Signal reference from PC)
8
CTS
6
DSR
2
RXD
1
DCD
5
GND
3
TXD
4
DTR
7
RTS
9
RI

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents