6.
Feed the twisted pair cables and the power cables through the opening and through the
wall box punch-out holes, securing them with cable clamps to provide strain relief.
NOTES:
7.
Trim back and insulate exposed cable shields with heat shrink to reduce the chance of
short circuits.
To prevent short circuits, the outer foil shield can be cut back to the point where the
cable exits the cable clamp.
8.
Connect the cables to the rear of the unit (see
Receiver Rear Panel
9.
Connect front panel devices (see
Front Panel
transmitter and receiver system. Make any cabling adjustments before final installation,
as the cables will be inaccessible afterwards.

Installing a Mud Ring

1.
Using the mud ring as a guide, mark the edges and cut out the material within the
marked area.
2.
Insert the mud ring into the opening, rotate and secure the locking arms with the
supplied screws shown in figure 3.
3.
Follow steps 6 through 9 of
and
Final Installation
Figure 3.
In order to fit in the junction box, the twisted pair cables and RJ-45 connectors
should not have a boot installed.
One power supply can power both the transmitter and the receiver (see
Power Supply Wiring
on page 11 and
on page 8 for connector details).
Transmitter Front Panel
on page 9 for connector details), restore the power supply, and test the
Preparing the Site and Installing the Wall Box
on the next page.
Wall
Wall Mounting
Bracket
Installing the Mud Ring
DTP DVI 4K 230 D Transmitter and Receiver • Introduction
Ground Loops
on page 15).
Transmitter Rear Panel
on page 7 and
on page 6 and
Receiver
above,
5

Advertisement

Table of Contents
loading

Table of Contents