Verifying A Successful Installation - Nortel 1750 Install Manual

Vpn router
Hide thumbs Also See for 1750:
Table of Contents

Advertisement

See the next section,

Verifying a successful installation

After you connect the gateway to the power source and turn it on, you can verify a
successful installation by checking the light emitting diodes (LED) on the front
panel
The following sequence of LEDs occurs:
1
2
3
4
5
If the LEDs on the front panel light in this sequence, your installation is
successful. If the LEDs do not light in this sequence, check that you correctly
installed the bezel on the gateway and that you properly attached the power cord
to the power supply (see
If the VPN Router 1750 still does not boot, contact your local Nortel Technical
Solutions Center (see
Chapter 1 Cabling the VPN Router and turning the power on 29
"Verifying a successful installation" on page
(Figure 2 on page
30).
The power LED (the Nortel logo) lights blue.
The Alert LED lights red and the Boot/Ready LED lights green.
When the gateway begins its boot sequence, the Boot/Ready LED lights
yellow and the Alert LED turns off.
After the boot process is complete, the Boot/Ready LED lights green,
indicating that the gateway is operational.
The Alert LED lights yellow because the gateway is not configured.
For a newly installed VPN Router 1750, a yellow Alert LED does not indicate
an alarm condition. After you configure the gateway, the Alert LED turns off.
(See
Chapter 4, "Configuring the management IP interface," on page
"How to get help" on page
"Connecting the power cord" on page
Nortel VPN Router Installation — VPN Router 1750
29.
28).
17).
67.)

Advertisement

Table of Contents
loading

Table of Contents