Daikin FDA125A5VEB Manual page 58

Split system air conditioners
Table of Contents

Advertisement

16
|
Unit installation
When installation of the system is already completed
Installer and user reference guide
58
3 Connect the single-phase power supply (50 Hz, 230 V) to connections No. 1
and No. 2 on the terminal block for power supply and earth.
4 Reattach the switch box cover (a).
5 Turn ON the power.
6 Start cooling operation (see
7 Gradually pour approximately 1  l of water through the air discharge outlet,
and check for leaks.
a
a Water inlet
b Portable pump
c Water inlet cover
d Bucket (adding water through water inlet)
e Drain outlet for maintenance
f Refrigerant pipes
8 Turn OFF the power.
9 Disconnect the electrical wiring.
10 Remove the control box cover.
11 Disconnect the power supply and earth.
12 Reattach the control box cover.
1 Start cooling operation (see the reference guide or the service manual of the
user interface).
2 Gradually pour approximately 1 l of water through the water inlet, and check
for leaks (see
"When installation of the system is not yet
"19.4 To perform a test
f
c
d
e
4
run" [
 72]).
b
completed" [
Split system air conditioners
4P495031-1B – 2022.10
4
 57]).