Unit installation
To connect the drain piping to the indoor unit
Installer and user reference guide
56
Rising piping. If necessary to make the slope possible, you can install rising
piping.
-
Drain hose inclination: 0~75 mm to avoid stress on the piping and to avoid air
bubbles.
-
Rising piping: ≤300 mm from the unit, ≤625 mm perpendicular to the unit.
a
b
a Metal clamp (accessory)
b Drain hose (accessory)
c Rising drain piping (vinyl pipe of 25 mm nominal diameter and 32 mm outer
diameter) (field supply)
d Hanging bars (field supply)
Combining drain pipes. You can combine drain pipes. Make sure to use drain
pipes and T-joints with the correct gauge for the operating capacity of the units.
a T-joint
NOTICE
Incorrect connection of the drain hose might cause leaks, and damage the
installation space and surroundings.
1 Push the drain hose as far as possible over the drain pipe connection.
2 Tighten the metal clamp until the screw head is less than 4  mm from the
metal clamp part.
3 Check for water leaks (see
4 Install the insulation piece (drain pipe).
5 Wind the large sealing pad (= insulation) around the metal clamp and drain
hose, and fix it with cable ties.
6 Connect the drain piping to the drain hose.
≤300
1000~1500
a
b
c
d
d
a
"To check for water
(mm)
(mm)
4
leaks" [
 57]).