Download Print this page
B&G PTT Operating Instructions

B&G PTT Operating Instructions

Pressurizing tank top

Advertisement

Quick Links

REPLACING THE BATTERY
PTT must be removed from the tank and placed
on a clean and dry surface. The On / Off switch
must be in the Off position.
Use a small hex wrench and an open-end
wrench to remove the screws that are visible
from the underside of the tank top.
When both screws are removed the top of
the unit can be removed by pulling on the
padded handle.
Note: Lift off the top carefully and do not
damage the connection of the On / Off
switch wire.
Disconnect the 2-pin connector attached to
the top of the battery and pull the battery
pack up from its base.
Insert a new battery pack and re-attach
the 2-pin connector.
Return the top to the base and re-
connect the two screws on the sides.
Pull
up
PRESSURIZING TANK
TOP - PTT
OPERATING
INSTRUCTIONS
READ AND UNDERSTAND THE SAFETY PRECAU-
TIONS BEFORE OPERATING THIS DEVICE
Electric Power. The PTT is designed to operate from an internal, re-
chargeable battery. The battery must be recharged periodically to
maintain operation of the internal air pump. Battery charger operates
from a three-wire power system in which one is a ground. Specifica-
tions: Input: AC 100 - 240V, 50/60 Hz, 0.3A. Output: DC 12.6V / 1.8A.
The battery in the PTT recharges in about 5 hours.
Compatibility. The PTT is compatible with stainless steel tanks made
by B&G Equipment Co. Use on other tanks is not sanctioned. It is not
intended for use with the B&G funnel-top concrete sprayer
(#12014006) or the funnel-top chemical resistant sprayer (#12013900).
Operation. Set and turn the PTT on the open top of a B&G stainless
¾
steel tank. After 2
turns, the PTT will be securely attached.
Note: If the PTT turns 4 times the tank gasket on the underside is
missing and must be replaced. Do not operate PTT without the tank
gasket.
Press On / Off switch to On to begin pressurizing a tank containing
liquid insecticide. Allow 2.5 minutes to pressurize a 1-gallon tank con-
taining 1 gallon of liquid. Switch should remain On while spraying. Turn
Off when tank is empty or spraying completed. Note: Slowly unscrew
PTT from a pressurized tank to allow air to escape.
135 Region South Drive, Jackson, GA 30233
Toll Free Customer Service
800-544-8811

Advertisement

loading
Need help?

Need help?

Do you have a question about the PTT and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for B&G PTT

  • Page 1 B&G funnel-top concrete sprayer connect the two screws on the sides. (#12014006) or the funnel-top chemical resistant sprayer (#12013900). Operation. Set and turn the PTT on the open top of a B&G stainless ¾ steel tank. After 2 turns, the PTT will be securely attached.
  • Page 2 23 psi (1.5 bar). The pump will shut off automatically • Inspect the bottom of the PTT to be certain the tank gasket is when the pressure reaches 30 psi (2.0 bar). Pres- firmly in place..