Koyker FLEXSTOR 1055 Owner's Manual page 13

Grain bag unloader
Table of Contents

Advertisement

Hitch Top Tube
Remove Pins
3. Remove the two pins holding the hitch
top tube in place.
Securing Bracket
Hitch Top Tube
4. Place the top tube into its operation
position and install the
NOTE: Two people are required for
switching the hitch from transport to
operation position
5. Have one person hold the hitch will the
other pulls the tractor ahead a few feet.
SECTION 4 - OPERATION
Install Pin
pin.
safely.
Install Pin
6. Lift the hitch up to its operation position
and install the pin.
3 pt Hitch Points
7. Connect the tractor to the GBU using the
3 pt hitch.
NOTE: The front of the GBU may need to be
raised or lowered to align it with the
tractor.
4-2

Advertisement

Table of Contents
loading

Table of Contents