Agilent Technologies N2797A User Manual page 46

Extreme temperature single-ended active probe
Table of Contents

Advertisement

5
Performance Verification
Test 2. Bandwidth
46
e
Connect short end of Calibration Standard to the available
end of the PORT 2 SMA cable.
f
Select short screen key the Reverse group.
g
Wait until the VNA beeps indicating that it has completed
the task.
h
Connect load end of Calibration Standard to the available
end of the PORT 2 SMA cable.
i
Select the loads screen key the Reverse group.
j
Press broadband screen key selection.
k
Wait until the VNA beeps indicating that it has completed
the task.
l
Press the done loads screen key.
m
You have just calibrated the other side of the reference
plane.
16
Press standards done key.
17
Connect the PORT 2 SMA cable to the non- pincher side of PV
fixture as shown in
Figure 18
Forward and Reverse Setup
Figure
18.
N2797A User's Guide

Advertisement

Table of Contents
loading

Table of Contents