IF1200 User Manual
Example Mission, Continued
Step
After you have finished planning a mission, you can see details of the mission in the
Mission Command List, on the right side of the screen. To see details about individual
12
events in the mission, select an event, such as a Waypoint, and details about that
event appear below it (see the figure below).
Note: The mission can be uploaded to the aircraft two ways: wirelessly; or via a
physical connection. The following steps describe both ways.
1. power on the aircraft
2. If you are uploading the mission wirelessly, proceed to Step 14.
13
3. If you are uploading the mission via a physical connection, connect a USB
cable between the device supporting QGC and the USB port on the aircraft.
Then go to the next step.
When you have completed planning the mission, an Upload Required icon in the
upper-right corner of the screen flashes. Select it, and Done appears at the top of the
14
screen if the upload was successful.
IFT Doc. Num. 102090, Rev. 3.00
Continued next page
Figure 22. View Details About Mission Events
Action
17. Planning a Mission
Page 43
Need help?
Do you have a question about the IF1200 and is the answer not in the manual?