Hide thumbs Also See for interpret:

Advertisement

interpret
1: Pre-Assemble Gables, Transverse Beams, Height Adjustable Blocks.
(001, 002, 003, 007, 009,011)
End/Finish
Gable Connection
3. Connect Frames together as required.
Installation Guide Refence (002, 010, 011)
Mid Gable
Connection

4: Level and Square Frame

Installation Guide reference (001, 002, 009, 0010, 011)
Mid Gable
Connection
Leveler Cover is
located inside Leg,
assembled and
secured in place
with tape.

2: Assemble Frame.

(001, 002, 009, 010, 011)
Mid Gable
Connection

5: Assemble Return Frames.

installation Guide Reference (003, 004a, 004b)
Date: Feb. 2017
Page No:
Mid Gable
Connection
Frame
Connection
Gable
Connection
1 of 2

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the interpret and is the answer not in the manual?

Questions and answers

Summary of Contents for Teknion interpret

  • Page 1 Date: Feb. 2017 Page No: 1 of 2 1: Pre-Assemble Gables, Transverse Beams, Height Adjustable Blocks. 2: Assemble Frame. (001, 002, 003, 007, 009,011) (001, 002, 009, 010, 011) Mid Gable Connection Mid Gable Connection End/Finish Mid Gable Gable Connection Connection 3.
  • Page 2 Date: Feb. 2017 Page No: 2 of 2 6: Install Electrics. 7: Assemble Worksurface hardwares, Accessory Rails, Ceiling Installation Guide Reference (401a, 401b, 403a, 403b, 405a, 405b, 405c) Feed and Base Feed Cover. Installation Guide Reference (001, 002, 003, 004, 005a, 005b, 007, 011, 402, 403c) 10: Install Storages and Screens.

Table of Contents