Mounting The Gate Operator - Viking G-5S Installation Instructions Manual

Table of Contents

Advertisement

GATE OPERATOR INSTALLATION

Mounting the Gate Operator

! Caution:
If the Front Mounting Bracket is not attached to a frame member that
runs the full length of the gate, the gate operator may damage the gate. DO NOT
attach the bracket or backing plate to just a few pickets.
STEP 1
Front Mounting Bracket:
a. Position the bracket according to the
dimensions provided on pages 14 or 15.
b. Ensure the bracket is level and tack
weld in place.
!
TIP:
Alternatively, if you choose to bolt
this bracket to the gate, a backing plate
has been provided with four bolt holes.
STEP 3
Mount the Gate Operator:
a. Install the operator onto the mounting
brackets.
b. Place the Manual Release Switch in the
"Release" position. Refer to page 11.
c. Manually move the gate to ensure the
gate and operator moves freely.
Post Mounting Option
Part # VA-G5PSKT Post Mount Kit is available for the G-5 Operator as an option to
welding the operator Mounting Brackets.
1.
Mounting hardware provided for 3 1/2 " round, 4" and 6" square posts.
2. Mounting Brackets are powder coated 1/4" steel.
1 6
www.PerformanceGateOpeners.com | (800) 878-7829 | Sales@PerformanceGateOpeners.com
Refer to Dimensions
A & B for positioning
Level Line
STEP 2
Back Mounting Bracket:
a. Cut and position the bracket according
to pages 14 or 15.
b. Ensure the bracket is level and tack
weld in place.
!
TIP:
Alternatively, if you choose to bolt
this bracket to the gate, a backing plate
has been provided with four bolt holes.
STEP 4
Complete the Installation:
a. Dismount the operator.
b. Complete the welding process.
c. Lubricate the front bracket pivot point.
d. Reinstall the gate operator and verify
once again that the gate moves freely.
e. Place the Manual Release Switch back
to the "Engage" Position.

Advertisement

Table of Contents
loading

Table of Contents