Din Rail Installation; Power On The Switch - Intellinet 560559 User Manual

Web smart managed switches
Hide thumbs Also See for 560559:
Table of Contents

Advertisement

2.1.3

DIN Rail Installation

For Industrial Models, the Switch can be installed onto a DIN rail. Follow these
instructions:
With the DIN-rail bracket attached to the device with screws, angle the
1.
bracket onto the DIN rail.
Push in the device until it clicks into place.
2.
1.
2.1.4

Power on the Switch

The Switch is powered on by the AC 100 – 240 V 50/60 Hz internal high-
performance power supply. Please follow the next tips to connect:
AC Electrical Outlet:
It is recommended to use single-phase three-wire receptacle with neutral outlet or
multifunctional computer professional receptacle. Please make sure to connect the
metal ground connector to the grounding source on the outlet.
AC Power Cord Connection:
Connect the AC power connector in the back panel of the Switch to external
receptacle with the included power cord, and check the power indicator is ON.
When it is ON, it indicates the power connection is OK.
DC Terminal Block Installation (for Industrial models)
NOTE: Ensure all power is off/disconnected before beginning!
Loosen appropriate screws.
1.
Insert bare power-supply wires into appropriate terminal slots (positive wire
2.
into positive slot; negative wire into negative slot).
Tighten appropriate screws to secure wires. (If desired, repeat steps 1 – 3 on
3.
second input pair.)
Install block into the device and tighten screws.
4.
Example — Your model may be different.
1.
Web Smart Managed PoE Switches User Manual
2.
2.
11
3.
4.

Advertisement

Table of Contents
loading

This manual is also suitable for:

561167561198561341561426508834

Table of Contents