b) Fit the protective rubber sleeve onto the cable where it leaves the connection
c) Attach the connection flange to the entrance flange.
6. Connect the SUBCAB cable phase leads to the starter equipment according to the
diagram in
7. Perform the system setup by using the Setup wizard and other commissioning
procedures in the chapter "System Setup" in the SIO Manual for the MAS 801.
P7900 Installation, Operation, and Maintenance Manual
10
8
9
11
1. Protective sleeve
2. Washer
3. Connection flange
4. Washer
5. Seal sleeve
6. Washer
7. O-ring
8. Spacer ring
9. Washer
10. Seal sleeve
11. Washer
Figure 8: Drive unit
Pumps with drive units 705–776 are also equipped with a cable holder illustrated
here.
Figure 9: Cable holder. Pumps equipped with MAS 801 do not have the auxiliary cable.
housing.
The rubber sleeve must have the correct size to give the correct compression around
the cable.
Make sure that the seal sleeve is not misaligned with the rubber sleeve. Check that
the entrance flange supports the cable so that it cannot be excessively bent.
Power cable phase sequence
6
4
5
2
7
3
on page 33.