Xylem FLYFT P7900 Installation, Operation And Maintenance Manual page 28

Table of Contents

Advertisement

4 Installation
2
5
4
1. Install the monitoring equipment. See the System Installation and Operation (SIO)
Manual for the MAS 801 monitoring equipment.
2. Connect the two signal leads that are integrated in the SUBCAB
the MAS BU.
See the chapter "Installation" in the SIO Manual for the MAS 801 monitoring equipment.
3. If they are not already connected, then connect the T1 and T2 leads integrated in the
SUBCAB cable to the PEM. See the illustration and table in
applications
4. If they are not already connected, then connect the power leads:
a) Check the data plate to determine which connection is valid for the voltage supply.
b) Connect the power leads to the terminal board connection U1, U2, V1, V2, W1, W2,
5. Install the entrance flange:
a) Fit the entrance flange parts according to the illustration for the correct drive unit.
26
on page 28.
and ground (earth) according to the cable chart.
Cable charts
See
on page 36.
2
1
5
1. Seal sleeve
2. Spacer ring
3. Seal sleeve
4. O-ring
5. Washer
Figure 7: Drive units 705–776
1
3
6
3
4
P7900 Installation, Operation, and Maintenance Manual
1. PEM communication terminals
2. PEM control terminals
3. Functional ground
4. Cable tie
5. Terminal plate
6. Index arrow. The index arrow on
the terminal plate is aligned with
the cable inlet.
®
cable, T1 and T2, to
Terminals used in standard

Advertisement

Table of Contents
loading

Table of Contents